An impression of some days spent in close proximity to the logistical operation involved in moving a bridge from its place of construction/assembly to the final location downstream.
This gallery covers
three days of meticulous and precise execution of a well designed plan. Impressive engineering and work by all companies and workforce involved.
A project of "De Vlaamse Waterweg" by THV Jan De Nul-Herbosch Kiere THV, in cooperation with Victor Buyck Steel Construction, ALE Heavylift.com and Victrol Inland Transportation.
For more info and my "eyewitness account" of the steps that I specifically witnessed, look here :
https://www.dpreview.com/forums/post/60549932 and particularly here :
https://www.dpreview.com/forums/post/60549954Official website about the bridge replacement project (I do not know how long this page will stay maintained after the project ends) :
https://www.vlaamsewaterweg.be/brug-van-den-azijn